R series CZPTcal Geared Motor Traits
1. Characteristics:
1. High efficiency: ninety two%-ninety seven%
2. Compact composition: Modest offset output, two stage and three stage are in the exact same box.
three. High precision: the gear is made of higher-high quality alloy steel forging, carbonitriding and hardening treatment method, grinding procedure to guarantee substantial precision and stable operating.
four. High interchangeability: highly modular, serial layout, sturdy versatility and interchangeability.
2. CZPT parameters
Ratio | 3.41-289.seventy four |
Input electrical power | .twelve-160KW |
Output torque | 61-23200N.m |
Output speed | 5-415rpm |
Mounting variety | Foot mounted, flange mounted, foot and flange mounted, one-stage foot mounted, solitary stage flange mounted, Flange-mounted with extended bearing hub |
Input Method | Flange input(AM), shaft input(Ad), inline AC motor enter, or AQA servo motor |
Brake Release | HF-handbook release(lock in the brake launch position), HR-guide release(autom-atic braking placement) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Kind | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing substance | HT200 substantial-power forged iron from R37,47,fifty seven,67,seventy seven,87 |
Housing content | HT250 Large toughness forged iron from R97 107,137,147,157,167,187 |
Heat treatment technology | carbonitriding and hardening therapy |
Efficiency | 92%-97% |
Lubricant | VG220 |
Protection Course | IP55, F class |
CZPTshine Travel
ZheJiang CZPTshine Generate Co.,Ltd,the predecessor was a point out-owned armed forces mould business, was established in 1965. CZPTshine specializes in the comprehensive power transmission solution for large-stop gear manufacturing industries based mostly on the goal of “System Product, Application Design and Specialist Service”.
CZPTshine have a robust specialized pressure with over 350 workers at current, such as above thirty engineering professionals, thirty quality inspectors, covering an spot of 80000 square meters and kinds of innovative processing devices and screening equipments. We have a great foundation for the market application growth and service of higher-finish pace reducers & variators proudly owning to the provincial engineering technological innovation research center,the lab of equipment velocity reducers, and the base of modern day R&D.
Our Staff
Quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
7. Certification.
Packing
Supply