R series CZPTcal Geared Motor Traits
one. Attributes:
1. High effectiveness: ninety two%-ninety seven%
2. Compact structure: Tiny offset output, two stage and three stage are in the same box.
3. High precision: the equipment is made of large-top quality alloy metal forging, carbonitriding and hardening treatment, grinding approach to make sure higher precision and steady operating.
4. High interchangeability: highly modular, serial style, powerful versatility and interchangeability.
two. CZPT parameters
Ratio | three.forty one-289.seventy four |
Enter power | .12-160KW |
Output torque | sixty one-23200N.m |
Output speed | 5-415rpm |
Mounting type | Foot mounted, flange mounted, foot and flange mounted, solitary-stage foot mounted, one stage flange mounted, Flange-mounted with prolonged bearing hub |
Enter Approach | Flange enter(AM), shaft enter(Ad), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-handbook release(lock in the brake launch situation), HR-handbook launch(autom-atic braking placement) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Variety | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing substance | HT200 large-strength forged iron from R37,forty seven,57,sixty seven,77,87 |
Housing material | HT250 Higher strength cast iron from R97 107,137,147,157,167,187 |
Heat treatment technology | carbonitriding and hardening remedy |
Performance | ninety two%-ninety seven% |
Lubricant | VG220 |
Protection Course | IP55, F class |
CZPTshine Push
ZheJiang CZPTshine Drive Co.,Ltd,the predecessor was a point out-owned navy mould company, was established in 1965. CZPTshine specializes in the complete energy transmission answer for high-stop tools manufacturing industries primarily based on the aim of “Platform Merchandise, Application Layout and Specialist Support”.
CZPTshine have a powerful technical drive with above 350 personnel at current, which includes in excess of thirty engineering experts, thirty quality inspectors, covering an area of 80000 sq. meters and kinds of superior processing devices and testing equipments. We have a very good basis for the market software advancement and support of large-finish speed reducers & variators owning to the provincial engineering technologies analysis centre,the lab of equipment pace reducers, and the foundation of modern R&D.
Our Staff
High quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
seven. Certification.
Packing
Supply